Comparative Project Style Analysis

New Solutions VS Traditional Solutions

Comparative Projects Style Analysis

图片

Mobile
Solar Energy Container

Compared with

Traditional
Solar Station

图片(1)
Technical Index
Mobile Solar Energy Container
Traditional Solar Station
Project Advancement
Field Deployment Time

1-2 days

10-15 days

Fast deployment

Implementation Installer

4-6 persons

6-10 persons

Less installers

Turnover Repetition Rate

Transferable, reusable 10 times a year

Not transferable, only fixed use

High reuse rate

Installation Difficulty

Plug&Play

Complex construction procedure

Simple construction steps

Modular Portability

Assembly form, modular, easy to install

No portability, fixed position

Modular system

Environmental Impact

Readily transferable

Affected by climate and disasters

Less affected

Comparison with Diesel Power Generator (200KW)

图片

Mobile
Solar Energy Container

Compared with

Diesel
Power Generator

ff067c02da657f743abd36d31ecbd14
200Kwp Case
Mobile Solar Energy Container
Diesel Power Generator
Environmental Impact

Renewable energy

Contaminant

Initial Cost

High

Cheap

Fuel Consumption(Year)

0

Machine price * 2.5

Maintenance Cost(Year)

Regular inspection and cleaning

Replacement parts, repairs, refuelling

Total Cost(2 Years)

Cheaper than initial cost

Higher than initial cost

Long-term Reliability

High life span

Easy damage

Return Period(Estimated)

≈8.3 months

>2 years

Rol (Return On Invenstment)

About 190%

/

Mobile solar energy container connects diesel generator: The operation of diesel engines during the day can be reduced, thus reducing CO2 emissions.

In addition, operating costs are reduced.

Scroll to top